Power Box/ Power Distribution Box/ Distribution Board
Basic Info
Model NO. | YS-2100234 |
Shell Material | Steel Plate |
Shell Protection Grade | Nonstandard Customization |
Brand | Yishang |
Service | Custom Service |
MOQ | 100 |
Transport Package | Plastic Bag, Foam, Kaa Carton |
Specification | Custom |
Trademark | YISHANG |
Origin | China |
HS Code | 8473409090 |
Production Capacity | 10000PCS/Month |
Product Description
Company Profile
Product Description
Product | Power box/ power distribution box/ distribution board |
Model Number | YS-2100234 |
Technology | CNC stamping, CNC bending, welding, grinding, riveting, tapping, etc |
Dimensions | Custom dimensions |
Material | Common is carbon steel, stainless steel or aluminum is available too |
Color | Custom color |
Surface Treatment | Powder coating |
Features | 0.1mm tolerance and perfect technology. |
Logo | Silk printing content and logo. |
Packaging | General is plastic bag + foam + KAA carton. |
Sample | Custom sample will be 3-time costs and half cost will be refunded |
Custom Service | YISHANG offers professional custom metal fabrication services |
Power box/ power distribution box/ distribution board
Metal frame:It is made of iron pipe and plate.The outer frame is dark gray, and the panel is treated with light white powder. Backplane:
The whole metal shell has four panelsInstallation method: we design the installation hole on the panel as a concave package and install it with round head screws. Accessories:Customized metal shell with four universal casters with foot pads.
Packaging & Shipping
Package and Transportation
The package method is that white foam, plastic bag and export KAA carton which can protect the electronic enclosures from damaging.
Each electronic project box is packed in one carton, the carton can be printed with buyers' brand logo. The customization of the packing configuration is warmly welcomed.
Each packaging will be tested for a collision to assure it is strong enough and won't have a problem during transportation. In this way, we can ensure the customer can receive the perfect metal enclosures.
What's the lead time for custom metal enclosures?
Sample: 48 hours.
First sample for mass production: 24 hours.
Mass production: delivery within 7 days.